Small Large Dumpster in Cleveland OH | HaulMyMess
DUMPSTER SIZES
10 Cubic Yard Dumpster
Approximate Measurements are approximate and may vary slightly based on availability and specific manufacturer.
Size: 11' x L, 8' x W, 3' x H
Days: Up to 7 Days
Rent Time Extension: Rent Time Extension: $15 Per Additional Day
Ton(s): Construction & Demolition = 2-ton weight limit, Trash = 1 ton weight limit - UNDER NO CIRCUMSTANCES CAN YARD WASTE BE MIXED WITH ANY OTHER MATERIAL ABSOLUTELY NO YARD WASTE CAN BE MIXED WITH THE LOAD.
Extra Weight: $50 for each additional ton if you have 100% construction material or demolition debris. $90 for each addition ton of trash or mixed material load.
15 Cubic Yard Dumpster
Approximate Measurements are approximate and may vary slightly based on availability and specific manufacturer.
Size: 11' x L, 8' x W, 4.5' x H
Days: Up to 7 Days
Rent Time Extension: Rent Time Extension: $15 Per Additional Day
Ton(s): * Construction & Demolition = 2-ton weight limit, Trash = 1.5-ton weight limit - UNDER NO CIRCUMSTANCES CAN YARD WASTE BE MIXED WITH ANY OTHER MATERIAL ABSOLUTELY NO YARD WASTE CAN BE MIXED WITH THE LOAD.
Extra Weight: $50 for each additional ton if you have 100% construction material or demolition debris. $90 for each addition ton of trash or mixed material load.
20 Cubic Yard Dumpster
Approximate Measurements are approximate and may vary slightly based on availability and specific manufacturer.
Size: 14' x L, 8' x W, 5' x H
Days: Up to 7 Days
Rent Time Extension: Rent Time Extension: $15 Per Additional Day
Ton(s): * Construction & Demolition = 3-ton weight limit or Trash = 2-ton weight limit - UNDER NO CIRCUMSTANCES CAN YARD WASTE BE MIXED WITH ANY OTHER MATERIAL ABSOLUTELY NO YARD WASTE CAN BE MIXED WITH THE LOAD.
Extra Weight: $50 for each additional ton if you have 100% construction material or demolition debris. $90 for each addition ton of trash or mixed material load.
30 Cubic Yard Dumpster
Approximate Measurements are approximate and may vary slightly based on availability and specific manufacturer.
Size: 16' x L, 8' x W, 6.25' x H
Days: Up to 7 Days
Rent Time Extension: Rent Time Extension: $15 Per Additional Day
Ton(s): * Construction & Demolition = 4-ton weight limit, * Trash = 3-ton weight limit - UNDER NO CIRCUMSTANCES CAN YARD WASTE BE MIXED WITH ANY OTHER MATERIAL ABSOLUTELY NO YARD WASTE CAN BE MIXED WITH THE LOAD.
Extra Weight: $50 for each additional ton if you have 100% construction material or demolition debris. $90 for each addition ton of trash or mixed material load.
40 Cubic Yard Dumpster
Approximate Measurements are approximate and may vary slightly based on availability and specific manufacturer.
Size: 22' x L, 8' x W, 6 x H
Days: Up to 7 Days
Rent Time Extension: Rent Time Extension: $15 Per Additional Day
Ton(s): * Construction & Demolition = 5-ton weight limit, * Trash = 4-ton weight limit - UNDER NO CIRCUMSTANCES CAN YARD WASTE BE MIXED WITH ANY OTHER MATERIAL ABSOLUTELY NO YARD WASTE CAN BE MIXED WITH THE LOAD.
Extra Weight: $50 for each additional ton if you have 100% construction material or demolition debris. $90 for each addition ton of trash or mixed material load.